000 01514nam a2200229 4500
001 31620
010 _a1880711036
090 _a31620
100 _a20120904d1998 y0pory50 ba
101 _aeng
200 _aGetting disputes resolved
_edesigning systems to cut the costs of conflict
_fWilliam L. Ury, Jeanne M. Brett, Stephen B. Goldeberg
210 _aCambridge (Mass.)
_cPON Books
_d1998
215 _aXVII, 201p.
_d21cm
300 _aIncludes bibliographical references and index. | Fundo documental do GRAL
330 _aPART ONE: UNDERSTANDING AND DESIGNING DISPUTE SYSTEMS - 1. Three approches to resolving disputes: interests, rigths, and power. 2. Diagnosing the existing. Dispute Resolution System. 3. Designing an effective. Dispute Resolution System 4. Making the system work: involving the disputing parties. PART TWO: BUILDING DISPUTES SYSTEMS: CASES FROM THE COAL INDUSTRY - 5. Diagnosing an industry's problems: wildcat strikes in coal mines. 6. Designing a low-cost dispute system: intervention at a strike-ridden coal mine. 7. Cutting dispute costs for an industry: the grievance mediation program. 8. Conclusion: The promise of dispute systems design. Appendix : Model rules for grievance mediation in the coal industry (1980). Notes.
606 _aMEDIAÇÃO
_9301
606 _aRESOLUÇÃO ALTERNATIVA DE LITÍGIOS
_921493
700 _aURY
_bWilliam L.
_924253
852 _jRAL_URY